深基坑施工8篇

時(shí)間:2023-03-07 15:04:36

緒論:在尋找寫作靈感嗎?愛發(fā)表網(wǎng)為您精選了8篇深基坑施工,愿這些內(nèi)容能夠啟迪您的思維,激發(fā)您的創(chuàng)作熱情,歡迎您的閱讀與分享!

深基坑施工

篇1

關(guān)鍵詞:深基坑;施工影響;安全分析

Abstract: in the early 1940 s, in some countries in Europe and America appear "deep foundation pit" that, its main is aimed at building surface and underground structure space construction, its depth in general to more than seven meters. With the high speed development of city construction in our country, more and more of the high-rise building ends gradually to development, and to extend a high altitude, but also in constant underground architectural exploration. At present, the domestic underground building more and more, the deep excavation depth deeper and deeper, and the influence of the architecture around the also is very obvious, the potential security threats is self-evident. Therefore, the construction of the deep foundation pit impact analysis is of great significance.

Keywords: deep foundation pit; Construction influence; Safety analysis

中圖分類號: TV551.4 文獻(xiàn)標(biāo)識碼:A 文章編號:

隨著我國城市建設(shè)的快速發(fā)展,城市中的高層建筑越來越多,而且這些建筑物的實(shí)際高度并不是人們從外面看到的那樣,其地下還有一部分,并且,未來的建筑會(huì)更傾向于地下建設(shè)。這樣一來,深基坑技術(shù)的重要性就凸顯出來,其工程質(zhì)量的好壞對周邊的環(huán)境影響非常大,因此,相關(guān)的技術(shù)人員一定要在施工過程中慎重起見。由于篇幅有限,本文主要探索深基坑施工對基坑變形有哪些影響。

一、基坑監(jiān)測對象及其周邊基本情況

(一)基坑基本資料

本文基坑監(jiān)測建筑物層數(shù)為30層,地下2層,框剪結(jié)構(gòu),基礎(chǔ)為樁基。本基坑重要性等級為一級,基坑采用單排灌注樁+鋼筋混凝土頂撐及角撐系統(tǒng)?;觾?nèi)支撐所在平面上部支護(hù)體系為土釘墻+攪拌樁(內(nèi)置鋼管樁)+噴錨,該部分采用不放坡、分層分段開挖。用地范圍內(nèi)場地基本平坦,自然地面黃海高程為8.77~8.98m,平均標(biāo)高8.900m。基坑開挖面積約2307.52m2,基坑周長為245.77m,開挖深度為±0.000下-10.200m~-14.10m(含承臺(tái)墊層)。監(jiān)測工作于2009年8月開始進(jìn)入工地進(jìn)行測點(diǎn)布設(shè),于2010年11月全部結(jié)束。

(二)基坑周邊環(huán)境簡介及監(jiān)測點(diǎn)布置圖

基坑西南兩側(cè)道路均非城市主干道。基坑北側(cè)有兩幢樓房,一幢樓為12層的酒店,一幢為6層的居民樓。基坑?xùn)|側(cè)為兩層臨時(shí)工人宿舍,為輕型鋼結(jié)構(gòu)板房。兩棟建筑距基坑圍護(hù)結(jié)構(gòu)最小距離約2米左右。

二、基坑監(jiān)測數(shù)據(jù)分析

(一)建筑沉降差

分析取四條有代表性的沉降差曲線進(jìn)行分析,其中每棟建筑兩條曲線,它們分別平行和垂直于基坑北側(cè)支護(hù)邊。曲線由兩個(gè)沉降監(jiān)測點(diǎn)來命名,其中“6-5”表示6#點(diǎn)的沉降量減去5#點(diǎn)的沉降量,且偶數(shù)點(diǎn)在距基坑較近,奇數(shù)點(diǎn)距基坑較遠(yuǎn)。圖中“6-5”和“5-1”分別為與酒店建筑垂直和平行的兩條曲線,“8-7”和“11-7”分別為與居民樓垂直和平行的兩條曲線。

圖1 基坑周邊建筑沉降差分析圖

從圖1中曲線可以看出,12層樁基礎(chǔ)房屋的沉降差小于6層天然基礎(chǔ)房屋的沉降差。由曲線“11-7”和“5-1”可知,5#點(diǎn)和7#點(diǎn)較1#點(diǎn)和11#點(diǎn)沉降量小,結(jié)合監(jiān)測點(diǎn)布置圖可推得基坑邊線中間部位的沉降量小于在基坑兩側(cè)的沉降量,這一現(xiàn)象與一般基坑周邊建筑的變形特性是不一致的。這主要是由于基坑施工過程中在支護(hù)段中部增加了8根預(yù)應(yīng)力錨索,有效地控制了基坑中部的支護(hù)結(jié)構(gòu)變形。

(二)建筑沉降量

從周邊建筑沉降量分析圖上可看出房屋的沉降主要發(fā)上在兩個(gè)時(shí)間點(diǎn)上,即2009年10月底和2010年02月初。基坑內(nèi)支撐以下土體的大面積開挖始于2009年10月28日,為配合土方開挖基坑進(jìn)行全面降水,由于水位降幅過大導(dǎo)致周邊建筑迅速沉降。在2010年02月初左右基坑大部分開挖到底,此時(shí)進(jìn)行的工程樁修復(fù)工程產(chǎn)生了超挖,因此這一時(shí)期基坑發(fā)生了較大的變形,這也導(dǎo)致了周邊建筑的變形。

圖2 基坑周邊建筑沉降量分析圖

(三) 基坑立柱沉降數(shù)據(jù)分析

基坑內(nèi)共有14個(gè)立柱監(jiān)測點(diǎn),由于三道內(nèi)支撐的剛度均較大,所以每道內(nèi)支撐的各個(gè)立柱之間沉降量差異不大,立柱沉降取其中4個(gè)有代表性的點(diǎn)進(jìn)行分析。

圖3 基坑立柱沉降分析圖

從圖3中可以看出隨著基坑開挖的進(jìn)行,立柱處于逐步隆起的狀態(tài),這主要是由于基坑回彈引起。立柱在保持隆起趨勢的同時(shí)存在著隆起量的波動(dòng),經(jīng)分析這些波動(dòng)主要與降水速率和水位有關(guān)。

(四)基坑水位數(shù)據(jù)分析

基坑共設(shè)置5口可用的水位觀察井,本次采用其中的3口進(jìn)行分析,其中2#和3#觀測井分別位于基坑中部南北兩側(cè),5#井位于基坑南側(cè)東段。由于基坑降水主要控制其水位降幅和降水速率,所以下面采用兩個(gè)曲線圖進(jìn)行降水分析。

圖4 基坑水位數(shù)據(jù)分析圖

總體上本次基坑的降水工作雖然圓滿的完成了排干基坑內(nèi)積水的任務(wù),但是對降水過程的控制非常不理想?;又顾∧晃茨苡行У淖柚够油獠康叵滤蚧觾?nèi)的滲透,基坑內(nèi)降水引起了坑外水位降低,從而導(dǎo)致周邊土體沉降。本次基坑水位降幅為12m左右,降水速率變化異常,且其值也遠(yuǎn)超過了0.5m/d的報(bào)警值。雖然本次基坑降水控制出現(xiàn)了較大的問題。

三、小結(jié)

隨著我國高新技術(shù)的不斷發(fā)展,高層建筑的施工過程更為容易,進(jìn)而促使人們追求更高更好的辦公、住宅環(huán)境。但是,在人們追求的過程中,切忌將工程安全質(zhì)量給忽視掉。地下建筑層數(shù)的增加,為施工技術(shù)帶來了更大的挑戰(zhàn),如何在安全施工以及使用的過程中,保證周邊環(huán)境的不受影響是今后高層建筑施工技術(shù)研究的重點(diǎn)。

參考文獻(xiàn):

[1] 高丙麗,張琨,任建喜,劉均紅.西安地鐵車站深基坑變形規(guī)律FLAC模擬研究[J].中國安全生產(chǎn)科學(xué)技術(shù),2012,03

[2] 黃勇博.青島近海地區(qū)深基坑支護(hù)方案優(yōu)化選擇[J].工程地質(zhì)計(jì)算機(jī)應(yīng)用,2012,01

[3] 李宗相.淺談軟土地基深基坑支護(hù)工程的施工技術(shù)[J].科技信息,2011,15

篇2

【關(guān)鍵詞】深基坑支護(hù);設(shè)計(jì);施工;安全

深基坑工程的設(shè)計(jì)是作為指導(dǎo)施工的決定性文件,在進(jìn)行設(shè)計(jì)是,我們應(yīng)綜合各方面的因素,采取最佳的設(shè)計(jì)方案,來節(jié)省工程的開支與施工時(shí)間,同時(shí)需要注意的是一定要對施工過程中可能出現(xiàn)的問題進(jìn)行預(yù)知,從而最大限度的避免施工質(zhì)量問題的產(chǎn)生,使大家獲得最大的收益。

1 深基坑支護(hù)的設(shè)計(jì)方案

深基坑支護(hù)是建筑工程中的基礎(chǔ),其質(zhì)量的好壞將直接影響工程整體的質(zhì)量,在設(shè)計(jì)時(shí)應(yīng)充分考慮各方面因素的影響及施工過程中可能遇到的問題及解決對策,確保工程能夠及時(shí)高效的完成,因此設(shè)計(jì)方案十分重要。往往一個(gè)工程要設(shè)計(jì)多份方案備用,然后根據(jù)實(shí)際情況最后敲定方案,設(shè)計(jì)方案中應(yīng)全面包括整個(gè)工程建設(shè)中各個(gè)細(xì)節(jié),以確保萬無一失。

2 深基坑支護(hù)的技術(shù)

深基坑支護(hù)不僅要求確保邊坡的穩(wěn)定,保證基坑內(nèi)正常作業(yè)安全,而且要滿足變形控制要求,以確保基坑周圍的建筑物、地下管線、道路等的安全。近年來出現(xiàn)了許多新的支護(hù)結(jié)構(gòu)形式與穩(wěn)定邊坡的方法。根據(jù)不同的地質(zhì)情況與現(xiàn)場邊界條件,常用的支護(hù)結(jié)構(gòu)有深層攪拌水泥土樁結(jié)構(gòu)、排樁內(nèi)支撐結(jié)構(gòu)、鉆孔灌注樁和旋噴樁結(jié)構(gòu)、土釘墻支護(hù)結(jié)構(gòu)及支錨工程等,下面將重點(diǎn)介紹前三中技術(shù)在深坑支護(hù)中的應(yīng)用。

2.1 深層攪拌水泥土樁在深基坑支護(hù)中的應(yīng)用

深層攪拌水泥土樁擋墻設(shè)計(jì),參照以往類似工程經(jīng)驗(yàn),充分考慮土體側(cè)向壓力及墻頂周圍的施工荷載,按重力式擋墻進(jìn)行設(shè)計(jì)并驗(yàn)算抗傾覆和側(cè)向位移??油鈧?cè)向壓力按水、土壓力分算,其中土壓力采用朗肯土壓力理論,坑內(nèi)土壓力計(jì)算采用m法計(jì)算土體反力。

墻底主動(dòng)土壓力強(qiáng)度:料斗容量,保證首灌后導(dǎo)管底埋入混凝土中大于1 m以上。在料斗內(nèi)放滿混凝土后,剪斷鐵絲,隔水栓埋入底部混凝土,此時(shí)后續(xù)混凝土澆搗必須及時(shí)跟上,保證混凝土連續(xù)施工。澆搗過程中,檢查導(dǎo)管提升、拆除等必須保證管底在混凝土中的埋置深度,宜控制在2 m~6 m。并應(yīng)通過測量確定,不能盲目估計(jì),避免撥空。在混凝土面上升將要接近鋼筋籠底部時(shí),應(yīng)放慢澆搗的速度,減少導(dǎo)管埋深以降低混凝土上升的沖擊力。

2.2 排樁內(nèi)支撐在深基坑支護(hù)中的應(yīng)用

排樁內(nèi)支撐支護(hù)是我國沿海地區(qū)應(yīng)用較多的一種聯(lián)合支護(hù)形式。支護(hù)樁有多種類型,鉆孔灌注樁用于較深基坑的支護(hù);沉管樁工程造價(jià)低,但抗彎性能差,且易擾動(dòng)軟土;預(yù)制樁也容易擾動(dòng)土體。而內(nèi)支撐系統(tǒng)可根據(jù)基坑形狀自由組合,能較好地支撐整體,也可在拆除后再次利用排樁內(nèi)支撐支護(hù)的優(yōu)點(diǎn)是支護(hù)系統(tǒng)較安全可靠。內(nèi)支撐的布置應(yīng)盡量簡潔,方便基坑挖土和地下室施工。此外,慎重選擇經(jīng)濟(jì)合理的支護(hù)樁樁型和樁長,對支護(hù)的工程造價(jià)和安全也有很大影響。

2.3 鉆孔灌注樁和旋噴樁在深基坑支護(hù)中的應(yīng)用

鉆孔灌注樁排樁式擋土墻作為板式支護(hù)體系的一種,主要應(yīng)用于當(dāng)基坑工程開挖深度較大時(shí),或開挖場地附近有較重要的建筑,或地下管線對變形控制有嚴(yán)格要求時(shí),或施工場地十分狹窄時(shí),考慮到施工穩(wěn)定性的保證、變形控制的要求和對施工場地的要求,采用放坡大開挖甚至采用重力式支護(hù)措施可能都難以保障開挖順利進(jìn)行的情況。樁間高壓旋噴樁是指利用鉆機(jī)把帶有噴嘴的注漿管鉆進(jìn)至土層的預(yù)定位置,以高壓使?jié){液或水形成高壓流從旋轉(zhuǎn)鉆桿的噴嘴中噴射出來,沖擊破壞土體。當(dāng)能量大、速度快和呈現(xiàn)脈動(dòng)狀噴射流的動(dòng)壓超過土體結(jié)構(gòu)強(qiáng)度時(shí),土粒便從土體剝落下來。一部分細(xì)小土粒隨著漿液冒出水面,其余土粒在噴射流作用下與漿液攪拌混合,并按一定比例和土粒質(zhì)量大小有規(guī)律的重新排列。漿液凝固,便在土中形成一個(gè)固結(jié)體。一般用于當(dāng)擋土深度較深,超過一般水泥攪拌樁的施工深度時(shí)(18 m--20 m),可以在灌注樁間設(shè)高壓旋噴樁,其止水深度可達(dá)幾十米。我國實(shí)踐證明,在砂類土、黏性土、黃土和淤泥中進(jìn)行噴射加固,效果較好。

3 深基坑支護(hù)的施工

在深基坑支護(hù)的施工中,未來保證工程的質(zhì)量及進(jìn)度,會(huì)借助一系列高科技手段以確保工程的順利進(jìn)行,主要有現(xiàn)代通訊確保數(shù)據(jù)傳輸,工程測量確保施工的精確度

3.1 數(shù)據(jù)通信及穩(wěn)定技術(shù)

深基坑施工數(shù)據(jù)通信及穩(wěn)定技術(shù)專用于深基坑鋼支撐軸力自適應(yīng)支撐系統(tǒng)的實(shí)時(shí)補(bǔ)償與監(jiān)控,作為數(shù)據(jù)采集和控制指令發(fā)送的橋梁,起著十分關(guān)鍵的重要作用。該項(xiàng)技術(shù)采用CAN總線來實(shí)現(xiàn)數(shù)據(jù)采集和控制指令發(fā)送,站與站之間采用方便的接插件技術(shù)并賦以新型可靠的穩(wěn)定技術(shù),確保數(shù)據(jù)傳輸可靠、安全,同時(shí)滿足了工地現(xiàn)場的方便使用。

3.2 工程測量在深基坑施工中的應(yīng)用

當(dāng)前,基坑支護(hù)設(shè)計(jì)尚無成熟的方法用以計(jì)算基坑周圍的土體變形,施工中通過準(zhǔn)確及時(shí)的監(jiān)測,可以指導(dǎo)基坑開挖和支護(hù),有利于及時(shí)采取應(yīng)急措施,避免或減輕破壞性的后果?;又ёo(hù)監(jiān)測一般需要進(jìn)行下列項(xiàng)目的測量:(1)監(jiān)控點(diǎn)高程和平面位移的測量;(2)支護(hù)結(jié)構(gòu)和被支護(hù)土體的側(cè)向位移測量;(3)基坑坑底隆起測量;(4)支護(hù)結(jié)構(gòu)內(nèi)外土壓力測量;(5)支護(hù)結(jié)構(gòu)內(nèi)外孔隙水壓力測量;(6)支護(hù)結(jié)構(gòu)的內(nèi)力測量;(7)地下水位變化的測量;(8)鄰近基坑的建筑物和管線變形測量等。

3.3 復(fù)合土釘技術(shù)在深基坑施工中的應(yīng)用

復(fù)合土釘支護(hù)技術(shù)是將土釘墻與其他支護(hù)形式或施工措施聯(lián)合應(yīng)用于土體開挖和邊坡穩(wěn)定的一種新的擋土技術(shù)。它將土釘墻與預(yù)應(yīng)力錨桿等結(jié)合起來,使得土釘墻技術(shù)在深基坑中應(yīng)用及垂直土釘墻成為現(xiàn)實(shí),并改善了土釘墻支護(hù)形式變形較大的缺陷。

4 深基坑支護(hù)中對安全的要求

任何工程建設(shè)都是將安全放在首位,但是近年來隨著城市建筑向高空發(fā)展,高層或超高層建筑越來越多,周圍環(huán)境越來越復(fù)雜,導(dǎo)致施工越來越難,而由深基坑施工誘發(fā)的事故也經(jīng)常發(fā)生。較為常見的事故即邊坡失穩(wěn)坍塌事故所包含的基坑破壞主要有五類:一是傾覆破壞;二是整體穩(wěn)定破壞;三是剪切破壞;四是滲透破壞,流砂、流土或管涌;五是局部隆起破壞,特別是整體圓弧滑動(dòng),塌方量大,破壞力強(qiáng),已引起業(yè)內(nèi)人士的高度重視。要確保深基坑施工的安全,必須掌握以下要點(diǎn):(1)要重視深基坑支護(hù)的方案和設(shè)計(jì)工作。在選擇支護(hù)方案時(shí),必須結(jié)合實(shí)際情況確定,必須根據(jù)某一工程的地質(zhì)環(huán)境、地下情況以及周圍環(huán)境而定。同時(shí),應(yīng)組織專家對深基坑支護(hù)結(jié)構(gòu)進(jìn)行論證,確保其安全性、經(jīng)濟(jì)性和可操作性。(2)必須十分重視深基坑開挖所在地的地形、地貌和工程地質(zhì)特點(diǎn)的勘察,在勘察工作中事先摸清可能導(dǎo)致邊坡土體滑坡的各種因素;對支護(hù)結(jié)構(gòu)的穩(wěn)定性和安全性造成威脅的重要地段、重點(diǎn)層和重要的土質(zhì)指標(biāo)要保證其可靠性;查明場地內(nèi)地下水的類型、水位、補(bǔ)給條件和動(dòng)態(tài)變化及其滲透性。(3)選擇具有豐富深基坑支護(hù)設(shè)計(jì)經(jīng)驗(yàn)的設(shè)計(jì)單位進(jìn)行設(shè)計(jì)。設(shè)計(jì)單位的選擇關(guān)系到整個(gè)基坑支護(hù)工程的大局,一個(gè)好的設(shè)計(jì)不僅考慮其經(jīng)濟(jì)性,而且考慮其安全性,還應(yīng)結(jié)合場地特點(diǎn)實(shí)現(xiàn)其可操作性。(4)注重地下水的處理。地下水處理不當(dāng)往往會(huì)造成基坑倒塌事故,同時(shí)還會(huì)給周圍環(huán)境造成不良影響。在基坑開挖過程中,地下水采用何種方式進(jìn)行處理,首先要看建筑物所在地的工程地質(zhì)和水文地質(zhì)情況及周圍的環(huán)境而定,不能因?yàn)榛咏邓鸬孛嫦鲁两o周邊建筑物及管線造成破壞。(5)確保基坑支護(hù)工程的施工質(zhì)量。深基坑支護(hù)屬于地下工程,具有不可視性,其出現(xiàn)工程質(zhì)量事故的概率也比較大,一旦出現(xiàn)質(zhì)量問題,事后糾正和補(bǔ)救比較困難。因此,必須招專業(yè)的施工隊(duì)伍進(jìn)行施工,嚴(yán)把質(zhì)量關(guān)。

5 結(jié)語

隨著時(shí)代的發(fā)展,城市建筑物注定向更高更多發(fā)展,這就要求建筑技術(shù)要有更好的提升,雖然目前深基坑支護(hù)技術(shù)已經(jīng)比較完善,但隨著科技的發(fā)展嗎,更多的先進(jìn)技術(shù)會(huì)被應(yīng)用到深基坑技術(shù)中來,我相信未來深基坑技術(shù)會(huì)更加完善更加具有安全性。

參考文獻(xiàn):

篇3

關(guān)鍵詞:深基坑;設(shè)計(jì)施工;壓力

Abstract: This paper starts from the deep foundation pit design theory, characteristics, analyzes some problems existing in the design and construction of deep foundation pit, and the technology of deep foundation pit engineering in the future are discussed, for reference.

Key words: deep foundation pit design and construction; pressure;

中圖分類號:S611文獻(xiàn)標(biāo)識碼:A 文章編號:

前言

深基坑開挖與支護(hù)結(jié)構(gòu)是一個(gè)系統(tǒng)工程,涉及工程地質(zhì)、水文地質(zhì)、工程結(jié)構(gòu)、施工工藝和施工管理.它是集土力學(xué)、水力學(xué)和結(jié)構(gòu)力學(xué)于一體的綜合性學(xué)科。支護(hù)結(jié)構(gòu)又是由若干具有獨(dú)立功能的體系組成的整體、正因?yàn)槿绱耍瑹o論是結(jié)構(gòu)設(shè)計(jì)還是施工組織都應(yīng)從整體功能出發(fā),將各部分協(xié)調(diào)好,才能達(dá)到安全可靠、經(jīng)濟(jì)合理的目的。

1基坑支護(hù)的設(shè)計(jì)

基坑支護(hù)體設(shè)計(jì)要根據(jù)實(shí)際施工需求,結(jié)合基坑側(cè)壁安全等級及重要性系數(shù)科學(xué)嚴(yán)謹(jǐn)?shù)闹贫ㄔO(shè)計(jì)方案,應(yīng)充分做到以下幾點(diǎn):

1.1充分利用新技術(shù)、新理念,具體事物具體分析,不要生搬硬套傳統(tǒng)的設(shè)計(jì)理念。

在現(xiàn)今的深基坑支護(hù)結(jié)構(gòu)的設(shè)計(jì)領(lǐng)域,還沒有公認(rèn)的、權(quán)威的的計(jì)算公式,基本上都是摸著石頭過河。深基坑支護(hù)結(jié)構(gòu)的設(shè)計(jì)要區(qū)別其他設(shè)計(jì)領(lǐng)域,要改變傳統(tǒng)觀念,利用施工監(jiān)測反饋動(dòng)態(tài)信息指引設(shè)計(jì)體系。

1.2重視支護(hù)結(jié)構(gòu)理論和材料的試驗(yàn)研究,實(shí)踐是檢驗(yàn)真理的唯一標(biāo)準(zhǔn)。

正確的理論必須建立在大量試驗(yàn)研究的基礎(chǔ)之上。在深基坑支護(hù)結(jié)構(gòu)的實(shí)驗(yàn)方面,我國與發(fā)達(dá)國家有較大距離,還有大量的路要走。不過,我國由于經(jīng)濟(jì)的飛速發(fā)展,大量高層超高層建筑拔地而起,所以積累了擁有大量的第一手施工數(shù)據(jù),但缺少科學(xué)的測試數(shù)據(jù),無法形成理論,我們以后一定要重視。

1.3勇于創(chuàng)新,設(shè)計(jì)支護(hù)結(jié)構(gòu)時(shí),開拓思路,多進(jìn)行新的嘗試。

在施工中深基坑支護(hù)結(jié)構(gòu)各元素往往是相互結(jié)合的,各結(jié)構(gòu)相互結(jié)合,這就要求我們從全局出發(fā),尋求新的設(shè)計(jì)思路,探索更好的計(jì)算方法。

基坑支護(hù)是一種特殊的結(jié)構(gòu)方式,具有很多的功能。不同的支護(hù)結(jié)構(gòu)適應(yīng)于不同的水文地質(zhì)條件,因此,要根據(jù)具體問題,具體分析,從而選擇經(jīng)濟(jì)適用的支護(hù)結(jié)構(gòu)。

2 基坑工程的特點(diǎn)

基坑工程是一項(xiàng)綜合性很強(qiáng)的系統(tǒng)工程,它不僅需要巖土工程的知識,也需要結(jié)構(gòu)工程的知識,它需要巖土工程與結(jié)構(gòu)工程技術(shù)人員密切配合才能創(chuàng)造出良好的工程?;庸こ躺婕巴亮W(xué)中穩(wěn)定、變形及滲流三個(gè)基本課題,三者熔融在一起,需要綜合處理。根據(jù)筆者的總結(jié),深基坑工程的主要特點(diǎn)有以下五點(diǎn):

(1)建筑傾向高層化,基坑向大深度方向發(fā)展。

(2)基坑開挖面積大,長度與寬度有的達(dá)數(shù)百米,給支撐體系帶來了較大的難度。

(3)在軟弱的土層中,基坑開挖會(huì)產(chǎn)生較大的位移和沉降,對周圍建筑物、市政建設(shè)和地下管線造成影響。

(4)深基坑施工工期長,場地狹窄,降雨、重物堆放等對基坑穩(wěn)定性不利。

(5)在相鄰場地的施工中,打樁、降水、挖土及基礎(chǔ)澆注混凝土等工序會(huì)相互制約與影響,增加協(xié)調(diào)工作的難度。

3 基坑施工中遇到的問題

3.1基坑邊坡坍塌。

這種情況一般發(fā)生在基坑施工階段和基坑支護(hù)施工剛結(jié)束不久。在北京朝陽區(qū)洼里某一工地,基坑支護(hù)剛完工不到兩天,邊坡從上至下整體坍塌,長度達(dá)五十余米。究其原因,支護(hù)施工單位沒有經(jīng)過合理的設(shè)計(jì),也沒有嚴(yán)格按設(shè)計(jì)施工,從坍塌的坡面看,盡管是土釘支護(hù),但是沒有按土釘支護(hù)規(guī)范進(jìn)行。大多數(shù)土釘沒有注漿,只是打了一些孔把鋼筋去;有些土釘雖然注了漿,但是孔內(nèi)漿體沒有注滿;有些土釘孔位置根本沒有打孔,只是將土釘桿體直接擊入土體。

3.2邊坡水平位移較大。

一些基坑邊坡水平位移較大,達(dá)到4cm以上,并且經(jīng)監(jiān)測,水平位移還在繼續(xù)加大。面對此種情況,結(jié)構(gòu)主體施工單位停止了地下主體施工,業(yè)主不得不立即召集基坑支護(hù)設(shè)計(jì)、施工單位和專家對基坑重新進(jìn)行穩(wěn)定性分析,并就出現(xiàn)的問題提出處理措施。

3.3附近建筑物變形。

在城市建設(shè)中,很多基坑緊鄰建筑物,處理稍有不當(dāng),附近建筑物就極易變形。一般來說,建筑物變形都是其地基沉降引起的。建筑物出現(xiàn)較大變形后,不僅危及樓上的居民或工作人員的安全,而且也對在施的工程造成威脅,使得工程難以繼續(xù)進(jìn)行下去。

4深基坑支護(hù)的土壓力及計(jì)算方法

4.1土壓力

土強(qiáng)度指標(biāo)的選擇土的抗剪強(qiáng)度指標(biāo)C,與土的固結(jié)度有密切的關(guān)系,土的固結(jié)過程就是土中孔隙水壓力的消散過程,對于同一種土,在不同排水條件下進(jìn)行試驗(yàn),可以得出不同的抗剪指標(biāo)c,故試驗(yàn)條件的選取應(yīng)盡可能反映地基土的實(shí)際工作狀態(tài)。

在基坑支護(hù)設(shè)計(jì)施工中,對于黏性土,計(jì)算圍護(hù)結(jié)構(gòu)背后由自重應(yīng)力而產(chǎn)生的主動(dòng)土壓力,采用三軸不排水剪指標(biāo)較合理。特別對于軟黏性土,最好采用現(xiàn)場十字板的原位測試方法確定C和ф,因?yàn)槭覂?nèi)試驗(yàn)的擾動(dòng)影響太明顯,強(qiáng)度指標(biāo)偏低,使設(shè)計(jì)過于保守。計(jì)算基坑內(nèi)被動(dòng)土壓力時(shí),一般宜采用三軸固結(jié)不排水剪。對于砂土,由于排水固結(jié)迅速,對于任何情況,均可采用排水剪指標(biāo),或采用固結(jié)不排水剪經(jīng)孔隙水壓力修正后的c值來計(jì)算土壓力。

4.2土壓力計(jì)算理論及方法

擋土結(jié)構(gòu)物的作用是用來擋住墻后的填土并承受夾自垃土的壓力。以下討論土壓力的大小和分布規(guī)律的確定方法。以下圖分別為三種不同情況的土壓力圖。當(dāng)認(rèn)為墻后填土達(dá)到極限平衡狀態(tài)時(shí),與墻背接觸的任一土單元體都處于極限平衡狀態(tài),然后根據(jù)土單元體處于極限平衡狀態(tài)時(shí)足的條件來建立土壓力的計(jì)算公式。假設(shè)墻本身是剛性的,不考慮墻身的變形、墻后填土延伸到無限遠(yuǎn)處,填土表面水平值為0、墻背垂直光滑。用O1、O2作摩爾應(yīng)力圓,如圖中應(yīng)力圓i所示

(1)試驗(yàn)結(jié)果證實(shí)了太沙基理論的定性結(jié)論,土壓力大小取決于位移的大小和位移方向。

(2)實(shí)測結(jié)果表明,當(dāng)變形小于5%H(H為開挖深度)時(shí),被動(dòng)土壓力仍然能得到充分發(fā)揮,所以說,對于深基坑工程的實(shí)際變形情況而言,套用一些經(jīng)驗(yàn)的位移指標(biāo)來判斷墻前土體是否達(dá)到被動(dòng)極限狀態(tài),是有局限性的。

(3)在黏性土上的許多基坑支護(hù)工程,護(hù)坡樁鋼筋強(qiáng)度未完全發(fā)揮,實(shí)際鋼筋應(yīng)力還低于鋼筋的設(shè)計(jì)強(qiáng)度,造成很大浪費(fèi),而造成鋼筋應(yīng)力低的原因主要是計(jì)算土壓力大于實(shí)際土壓力。實(shí)驗(yàn)還表明,把基坑支護(hù)結(jié)構(gòu)視為平面不合理,因?yàn)榛庸こ痰摹敖切?yīng)”即士壓力的空間效應(yīng),對墻移有明顯的抑制作用。利用這種空間效應(yīng)可以在兩邊折減樁數(shù)或減少配筋量。

4.3支護(hù)結(jié)構(gòu)計(jì)算方法

支護(hù)結(jié)構(gòu)的計(jì)算方法很多,有:靜力平衡法,等值梁法,彈性地基梁的m法,彈塑有限元法等等。在此介紹常用的一種情況下的算法,彈性地基梁的m法:

基坑工程彈性地基粱法取單位寬度的擋墻作為豎直放置的彈性地基梁,支撐簡化為與截面面積、彈性模量和計(jì)算長度等有關(guān)的二力桿彈簧。彈性地基梁法中土對支擋結(jié)構(gòu)的抗力(地基反力)用土彈簧模擬,地基反力的大小與擋墻的變形有關(guān),即地基反力由水平地基反力系數(shù)同該深度擋墻變形的乘積確定。~f=mzy,其中,f為土對支擋結(jié)構(gòu)的水平地基反力,kN/m2;m為比例系數(shù),kN/m4;z為計(jì)算深度,m;y為計(jì)算點(diǎn)處擋墻的水平位移,m。彈性地基梁的m法優(yōu)點(diǎn)是考慮了支護(hù)結(jié)構(gòu)與土體的變形協(xié)調(diào)。工程實(shí)踐表明,在軟土中的懸臂樁支護(hù)計(jì)算采用m法,計(jì)算位移與實(shí)測位移有很大差異,實(shí)測位移是計(jì)算值的好幾倍這說明樁后土體變形已不再屬于彈性范圍。另外,m法無法直接確定支護(hù)結(jié)構(gòu)的插入深度,通常假定試算有很大的隨意性,有時(shí)樁底落在軟弱土層中,還需經(jīng)驗(yàn)來修正。

篇4

1. 深基坑支護(hù)施工中存在的問題

現(xiàn)今深基坑支護(hù)結(jié)構(gòu)的設(shè)計(jì)理論雖然有了很大發(fā)展,但是在實(shí)際施工中仍然存在許多不足的地方,主要表現(xiàn)為如下幾個(gè)方面。

1.1 邊坡修理不達(dá)標(biāo)

在深基坑施工中經(jīng)常存在挖多或挖少的現(xiàn)象,這都是由于施工管理人員管理的不到位以及機(jī)械操作手的操作水平等多種因素的影響,使得機(jī)械開挖后的邊坡表面的平整度和順直度不規(guī)則,而人工修理時(shí)又由于條件的限制不可能作深度挖掘,故經(jīng)常性的會(huì)出現(xiàn)擋土支付后出現(xiàn)超挖和欠挖現(xiàn)象。這是深基坑支護(hù)工程施工中較為常見的不足之處。

1.2 施工過程與施工設(shè)計(jì)的差別大

在深基坑中需要支護(hù)施工時(shí),會(huì)用到深層攪拌樁,但其水泥摻量會(huì)不夠,這就影響水泥土的支護(hù)強(qiáng)度,進(jìn)而使得水泥土發(fā)生裂縫,另外,在實(shí)際施工中,偷工減料的現(xiàn)象也時(shí)常發(fā)生,深基坑挖土設(shè)計(jì)中常常對挖土程序有所要求來減少支護(hù)變形,并進(jìn)行圖紙交底,而實(shí)際施工中往往不管這些框框,搶進(jìn)度,圖局部效益,這往往就會(huì)造成偷工減料現(xiàn)象的發(fā)生。深基坑開挖是一個(gè)空間問題。傳統(tǒng)的深基坑支護(hù)結(jié)構(gòu)的設(shè)計(jì)是按平面應(yīng)變問題處理的。在未能進(jìn)行空間問題處理之前而需按平面應(yīng)變假設(shè)設(shè)計(jì)時(shí),支護(hù)結(jié)構(gòu)的構(gòu)造要適當(dāng)調(diào)整,以適應(yīng)開挖空間效應(yīng)的要求。這點(diǎn)在設(shè)計(jì)與實(shí)際施工相差較大,也需要引起高度的重視。

1.3 土層開挖和邊坡支護(hù)不配套

當(dāng)土方開挖技術(shù)含量較低時(shí),組織管理也相對容易。而擋土支護(hù)的技術(shù)含量較高,施工組織和管理都比土方開挖復(fù)雜。所以在實(shí)際的施工過程中,大型的工程一般都是由專業(yè)的施工隊(duì)伍來完成的,而且絕大部分都是兩個(gè)平行的合同。這樣,在施工過程中協(xié)調(diào)管理的難度大,土方施工單位搶進(jìn)度,拖延工期,開挖順序較亂,特別是雨天期間施工,甚至不顧擋土支護(hù)施工所需要工作面,留給支護(hù)施工的操作面幾乎是無法操作,時(shí)間上也無法去完成支護(hù)工作,對屬于巖土工程的地下施工項(xiàng)目,資質(zhì)限制不嚴(yán)格,基坑支護(hù)工程轉(zhuǎn)手承包較為普遍,一些施工單位不具備技術(shù)條件,為了追求利潤而隨意修改工程設(shè)計(jì),降低安全度?,F(xiàn)場管理混亂,以致出現(xiàn)險(xiǎn)情,未做到信息化施工和動(dòng)態(tài)化管理。這也是深基坑支護(hù)施工中常見的問題之一。

2. 深基坑支護(hù)實(shí)施策略

2.1 轉(zhuǎn)變傳統(tǒng)深基坑支護(hù)工程設(shè)計(jì)理念

現(xiàn)如今我國在深基坑支護(hù)技術(shù)上已經(jīng)積累很多實(shí)踐經(jīng)驗(yàn),初步摸索出巖土變化支護(hù)結(jié)構(gòu)實(shí)際受力的規(guī)律,為建立健全深基坑支護(hù)結(jié)構(gòu)設(shè)計(jì)的新理論和新方法打下了良好的基礎(chǔ)。但對于巖土深基坑支護(hù)結(jié)構(gòu)的實(shí)際設(shè)計(jì)和施工方法仍處于摸索和探討階段,而且,目前我國還沒有統(tǒng)一的支護(hù)結(jié)構(gòu)設(shè)計(jì)的相關(guān)規(guī)范和標(biāo)準(zhǔn)。土壓力分布還按庫倫或朗肯理論確定,支護(hù)樁仍用“等值梁法”進(jìn)行計(jì)算。這些陳舊的計(jì)算理論所計(jì)算出的結(jié)果與深基坑支護(hù)結(jié)構(gòu)的實(shí)際受力懸殊較大,既不安全也不經(jīng)濟(jì)。因此,深基坑支護(hù)結(jié)構(gòu)的施工工程設(shè)計(jì)不應(yīng)該再采用以往傳統(tǒng)的“結(jié)構(gòu)荷載法”,而應(yīng)徹底改變傳統(tǒng)的設(shè)計(jì)觀念,逐步建立以施工監(jiān)測為主導(dǎo)的信息反饋動(dòng)態(tài)設(shè)計(jì)體系。

2.2 重視變形觀測,并注意及時(shí)補(bǔ)救

巖土工程中深基坑支護(hù)結(jié)構(gòu)變形觀測的內(nèi)容包括:基坑邊坡的變形觀測、及周圍建筑物及地下管線變形觀測等。通過對監(jiān)測數(shù)據(jù)可以及時(shí)分析并及時(shí)了解土方開挖及支護(hù)設(shè)計(jì)在實(shí)際應(yīng)用中的情況,分析其存在的偏差便可以及時(shí)的了解基坑土體變形狀況以及土方開挖影響的沉降情況還有地下管線的變形情況等。對設(shè)計(jì)中存在的偏差,在下部施工中及時(shí)校正設(shè)計(jì)參數(shù),對已施工的部位采取恰當(dāng)?shù)难a(bǔ)救和控制措施,為此,要求現(xiàn)場變形觀測的數(shù)據(jù)必須準(zhǔn)確、可靠、及時(shí),要求變形觀測人員嚴(yán)格按照預(yù)定設(shè)計(jì)方案精心測量、認(rèn)真負(fù)責(zé),保證觀測質(zhì)量。如果在實(shí)際測量中確實(shí)發(fā)現(xiàn)異常情況,就需要即時(shí)研究采取措施以防止其惡化。而一旦出現(xiàn)大的變形或滑動(dòng),立即分析主要原因,做出可靠的加固設(shè)計(jì)和施工方案,使加固工作快速而有效,防止變形或滑動(dòng)繼續(xù)發(fā)展。研究和應(yīng)用已有的基坑工程行業(yè)的和地區(qū)性規(guī)范以及當(dāng)?shù)氐墓こ探?jīng)驗(yàn)。對于重大復(fù)雜的基坑工程目前國內(nèi)采用專家論證的形式,對保證工程安全、降低造價(jià)是有效和現(xiàn)實(shí)的一種方法。

2.3 全程控制基坑支護(hù)的施工質(zhì)量

巖土深基坑支護(hù)施工重在于過程控制,一旦施工過程控制環(huán)節(jié)出現(xiàn)問題,事后糾正和補(bǔ)救都會(huì)比較困難。因此我們必須進(jìn)行嚴(yán)格的施工過程控制管理,確保施工質(zhì)量。嚴(yán)格按設(shè)計(jì)方案組織施工。工程施工前,有關(guān)人員需要熟悉當(dāng)?shù)氐牡刭|(zhì)資料、本次施工設(shè)計(jì)圖紙及施工現(xiàn)場周圍的環(huán)境,另外,降水系統(tǒng)應(yīng)確保正常工作。施工單位在施工過程中不得隨意改變錨桿位置、長度、型號、數(shù)量,鋼筋網(wǎng)間距,加強(qiáng)筋范圍,放坡系數(shù)等。設(shè)計(jì)方案變更時(shí)必須重新經(jīng)專家評審?;又ёo(hù)施工單位要與挖土施工單位緊密配合,堅(jiān)持分層分段開挖和分層分段支護(hù)的施工原則進(jìn)行施工。土方開挖的順序和具體開挖的方法必須與設(shè)計(jì)的工作情況相一致,并遵循“開槽支撐,先撐后挖,分層開挖,嚴(yán)禁超挖”的原則,減少開挖過程中土體的擾動(dòng)范圍,縮短基坑開挖卸荷后無支撐的暴露時(shí)間,對稱開挖,均衡開挖,合理利用土體自身在開挖過程中控制位移的能力。巖土深基坑開挖的過程中應(yīng)采取措施以防止碰撞支護(hù)結(jié)構(gòu)、工程樁或撓動(dòng)基底原狀土。

篇5

【關(guān)鍵詞】地鐵;深基坑;施工

中圖分類號: U231 文獻(xiàn)標(biāo)識碼: A

由于我國地鐵深基工程的不斷發(fā)展,施工過程中的一些問題和不足不斷呈現(xiàn)處理,在施工不斷完善的新時(shí)期,加強(qiáng)對地鐵深基坑施工的把控,對確保地鐵工程的質(zhì)量有著重要意義。

一、地鐵深基坑設(shè)計(jì)、施工的危險(xiǎn)因素

1、實(shí)際地質(zhì)情況與地質(zhì)勘察報(bào)告描述的地質(zhì)資料不一致,造成設(shè)計(jì)計(jì)算的依據(jù)存在偏差。

在前期設(shè)計(jì)階段,由于拆遷工作尚未完全完成,許多地段不能進(jìn)行勘察,由于地質(zhì)情況變化復(fù)雜,有限的幾個(gè)勘察點(diǎn)不能反映該地段的全部地質(zhì)情況,據(jù)此進(jìn)行設(shè)計(jì)和施工招標(biāo)將該工程的中標(biāo)造價(jià)確定下來。在當(dāng)前工程施工市場競爭激烈的情況下,業(yè)主為了控制投資,往往要求中標(biāo)施工單位承擔(dān)因地質(zhì)情況變化而造成的風(fēng)險(xiǎn),實(shí)行總價(jià)包干,一個(gè)不成熟的設(shè)計(jì)方案就這樣被推到了實(shí)施階段。

2、巖土工程本身包含許多不確定性的因素

如巖土介質(zhì)空間的變異性,力學(xué)性態(tài)的模糊性,隨機(jī)量測誤差、測試統(tǒng)計(jì)誤差、測試模型誤差等,這些不確定性導(dǎo)致設(shè)計(jì)計(jì)算的土壓力與實(shí)際土壓力有差異。

3、施工環(huán)境惡劣

許多地鐵工程由于受整條線路通車時(shí)間的限制,不管何時(shí)具備開工條件,最后完工的工期往往是關(guān)門工期,在現(xiàn)場拆遷尚未完成的情況下,施工單位被迫開工,結(jié)果造成許多應(yīng)拆而未拆的建筑物位于基坑邊的危險(xiǎn)地段內(nèi),一旦基坑變形超過一定的限值或地表有不均勻沉降時(shí),便會(huì)危及該建筑物的安全。

4、施工措施不到位、不及時(shí)

一些施工現(xiàn)場項(xiàng)目部缺少能識別深基坑施工的危險(xiǎn)因素,合理組織深基坑施工的技術(shù)、管理人才,在深基坑施工出現(xiàn)問題時(shí),采取的施工措施往往是不到位或不及時(shí),以致小錯(cuò)釀成大錯(cuò)。

二、基坑開挖的處理措施

1、 圍護(hù)結(jié)構(gòu)和內(nèi)支撐系統(tǒng)

圍護(hù)結(jié)構(gòu)構(gòu)成一空間受力體系能夠支撐基坑主動(dòng)區(qū)土壓力和其他附加荷載,以提高基坑穩(wěn)定性。鑒于此,施工單位應(yīng)該選擇質(zhì)量和強(qiáng)度與設(shè)計(jì)要求相符的圍護(hù)支撐結(jié)構(gòu)。支架以及支架安裝質(zhì)量是質(zhì)量控制要點(diǎn)。判斷鋼架質(zhì)量時(shí),要重點(diǎn)檢查其材質(zhì)、活絡(luò)頭剛度、順直度、壁厚、螺栓連接強(qiáng)度、直徑和等強(qiáng)焊接質(zhì)量,并根據(jù)設(shè)計(jì)要求及時(shí)修正。安裝鋼構(gòu)支撐時(shí),一保持其順直,使鋼管支撐軸心受力;二確保接頭牢固,圍檁和接頭接觸部位能夠有一定的剛度和強(qiáng)度,保證接頭密貼圍檁,然后用速凝細(xì)石混凝土填補(bǔ)間隙。如果有角撐,圍護(hù)樁或圍檁接合處,除斜支座保證支撐軸心受力,同時(shí)要在圍護(hù)樁和圍檁之間考慮剪切傳遞。結(jié)構(gòu)柱與支撐的連接要為基坑回彈留有一定空間。油泵校驗(yàn)工作要不定期進(jìn)行,以確保油泵數(shù)據(jù)準(zhǔn)確,穩(wěn)定運(yùn)行。同時(shí),對每根支撐施加預(yù)應(yīng)力進(jìn)行記錄備查,如鋼支撐支撐軸力不達(dá)標(biāo),或由于結(jié)構(gòu)出現(xiàn)過大的扭曲而破壞支護(hù)結(jié)構(gòu)的穩(wěn)定性和失抗力,最終造成基坑因圍護(hù)不力而坍塌。

鋼支撐施加預(yù)應(yīng)力和預(yù)應(yīng)力復(fù)加:按照設(shè)計(jì)要求,安裝好鋼支撐后,在支撐一端或兩端立即依據(jù)設(shè)計(jì)值施加第一次預(yù)應(yīng)力,同時(shí)對接頭螺栓擰緊情況進(jìn)行檢查;第一次施加預(yù)應(yīng)力,需要對預(yù)應(yīng)力的損失及圍護(hù)結(jié)構(gòu)水平位移在24h內(nèi)進(jìn)行監(jiān)測,按照設(shè)計(jì)值對預(yù)應(yīng)力進(jìn)行復(fù)加。如果晝夜溫差過大,在一定程度上損失支撐預(yù)應(yīng)力,按照設(shè)計(jì)值在當(dāng)天低溫時(shí)立即對預(yù)應(yīng)力進(jìn)行復(fù)加;如果基坑變形速率超出控制范圍,同時(shí)接近警戒值,但是支撐軸力沒有達(dá)到自身規(guī)定值,這是在征得設(shè)計(jì)的同意后,可以通過增大支撐軸力的方式對變形進(jìn)行控制;對于圍護(hù)結(jié)構(gòu)來說,如果變形過大,通過被動(dòng)區(qū)注漿的方式對圍護(hù)結(jié)構(gòu)位移進(jìn)行控制,注漿1-2h內(nèi),按照設(shè)計(jì)值對注漿范圍支撐預(yù)應(yīng)力進(jìn)行復(fù)加,進(jìn)而在一定程度上將圍護(hù)結(jié)構(gòu)外移所造成的應(yīng)力損失降到最低;如果支撐軸力接近或者超出設(shè)計(jì)值,需要增設(shè)支撐分解軸力,進(jìn)一步提高抗變形能力,防止基坑變形增大。

3、土方開挖

(1)開挖土方的流程

在開挖深基坑土方之前,通常情況下,需要做好開挖前的準(zhǔn)備工作,建設(shè)深基坑的地下連續(xù)墻,按照設(shè)計(jì)方案的強(qiáng)度等級,確保連續(xù)墻的混凝土的強(qiáng)度。對這兩項(xiàng)工作的完工進(jìn)行檢查,檢查合格后,根據(jù)全面挖土作用的施工方式進(jìn)行施工。在開挖的具體流程方面,首先采用挖掘機(jī)挖掘后隨即裝車運(yùn)走的方法對地面到首層混凝土環(huán)板支撐下0.1m進(jìn)行開挖施工,隨后按照自上而下的順序進(jìn)行分層開挖,在開挖二層以下的過程中,為了確保施工的安全性,需要安裝相應(yīng)的鋼結(jié)構(gòu)。

(2)開挖前準(zhǔn)備

為了確保施工順利進(jìn)行,需要清理深基坑,清除妨礙施工的障礙物;在開挖基坑的過程中,需要對抽出的水進(jìn)行處理,然后排入公共的排水井道,所以需要在深基坑周圍建立相應(yīng)的排水溝和沉淀池,進(jìn)而在一定程度上防止發(fā)生堵塞;按照施工設(shè)計(jì)方案,需要設(shè)置相應(yīng)的監(jiān)測站點(diǎn),完成監(jiān)測站點(diǎn)設(shè)置后,需要準(zhǔn)確的測量和記錄原始的數(shù)據(jù);在排水方面,對當(dāng)?shù)氐乃牡乩硖卣骱拖鄳?yīng)的地勢環(huán)境進(jìn)行綜合考慮,同時(shí)對地面排水系統(tǒng)、地下排水等,科學(xué)規(guī)劃,合理設(shè)計(jì)。

(3)開挖方法

在開挖深基坑土方的過程中,豎向分層次、縱向分段按對稱是開挖遵循的原則。在縱向分段開挖過程中,需要制定具體的開挖方案,對施工現(xiàn)場周圍的地質(zhì)條件、水文特征等環(huán)境因素進(jìn)行綜合考慮;設(shè)置支撐的距離,以及具體施工設(shè)備的運(yùn)行能力等是進(jìn)行豎向分層開挖施工時(shí)需要進(jìn)行考慮的。

4、降排水

在施工過程中,如果降水不到位,在一定程度上會(huì)使基坑開挖面成為一個(gè)泥塘,進(jìn)而增加土方開挖的困難。通常情況下,通過管井進(jìn)行施工降水,在基坑兩側(cè)按照間距20m布置管井,建立排水體系。在基坑開挖前20天完成降排水施工。在施工過程中,注意地表、基坑內(nèi)的引排水,進(jìn)而防止對基坑圍擋造成沖刷、浸泡等。在開挖基坑的過程中,在基坑四周地表設(shè)置截水溝,通過截流、導(dǎo)流等對基坑外地表水進(jìn)行處理。在基坑內(nèi)部,排水明溝及集水井需要分級進(jìn)行設(shè)置,在基坑內(nèi)四周坡腳處設(shè)置排水溝,并且溝底寬度要≥0.3m,邊緣距基坑圍護(hù)結(jié)構(gòu)內(nèi)壁≥0.5m,縱向坡度≥0.5%,溝底比基坑開挖底低0.5m;每隔20m,在基坑四角及基坑邊設(shè)置相應(yīng)的集水井,在高度方面,排水溝底要高出井底1.0m,通過濾水管等透水材料對集水井井壁進(jìn)行處理,通過水泵將坑內(nèi)集水排至地面市政雨、污水系統(tǒng)中;在雨季進(jìn)行施工時(shí),需要加大排水的力度,在一定程度上確保施工安全,以及設(shè)備正常運(yùn)轉(zhuǎn),做到雨過即可復(fù)工。開挖基坑土方時(shí),對維護(hù)結(jié)構(gòu)的滲漏水要給予高度的關(guān)注,及時(shí)對滲漏水進(jìn)行堵漏處理。對于有些基坑來說,雖然最初是漏水,隨著進(jìn)一步的惡化,最后可能形成流沙流泥等,進(jìn)而在一定程度上導(dǎo)致基坑周邊建筑物出現(xiàn)沉降,甚至導(dǎo)致基坑失穩(wěn),造成周邊建筑物倒塌。

5、遠(yuǎn)程監(jiān)控

對深基坑進(jìn)行遠(yuǎn)程監(jiān)控,通常情況下是在傳統(tǒng)監(jiān)測的基礎(chǔ)上,對基坑變形通過網(wǎng)絡(luò)進(jìn)行傳輸?shù)谋O(jiān)測方式,這種監(jiān)測方式能夠?qū)幼冃芜M(jìn)行直觀反映,是信息化施工的一種方式,在確保深基坑開挖安全方面發(fā)揮著重要作用。監(jiān)測內(nèi)容主要包括:地表沉降、支撐軸力等。通過對這些內(nèi)容進(jìn)行監(jiān)測,一旦發(fā)生監(jiān)控?cái)?shù)據(jù)接近或者超過警戒值,可以及時(shí)采取相應(yīng)措施,調(diào)整施工步驟,進(jìn)而在一定程度上對基坑變形進(jìn)行控制,進(jìn)一步確?;拥陌踩?。

三、結(jié)束語

地鐵深基坑工程是一項(xiàng)全面系統(tǒng)復(fù)雜的綜合性施工工程,尤其要加強(qiáng)對深基坑質(zhì)量中常見問題的認(rèn)識與研究,提高處理措施的能力,結(jié)合實(shí)際情況進(jìn)行施工,加強(qiáng)地鐵深基坑的質(zhì)量。

參考文獻(xiàn)

篇6

關(guān)鍵詞:深基坑;施工;支護(hù)

Abstract: With the rise of high-rise buildings and the popularization, more and more deep excavation. In recent years, with the construction of a large number of high-rise and super high-rise buildings, the developers to improve the rate of land for construction, requirements and relevant national specifications of embedded depth of foundation and the civil air defence engineering, essential for design of basement multilayer, high-rise, super high-rise building, so for the construction of deep foundation pit put forward a very high request. This article takes a project as an example, to do some research for several key problems in construction of deep foundation pit.

Key words: deep foundation pit support; construction;

中圖分類號:TU74

工程概況

本工程為某單位的辦公樓,地下室有2層,基坑?xùn)|西長約99.2 m,南北寬約41.5 m,工程占地面積僅4560 m2,基坑面積占其84% ,約3840m2 。由于地處老城區(qū),施工作業(yè)場地狹小,開挖深度5.25m~9.75 m?;又苓叚h(huán)境復(fù)雜,東距居民小巷最近2.08 m、小巷東側(cè)商住樓8 m;南距綜合樓9.1 m;西距另一小區(qū)A棟10.7 m;北距繁華的大馬路人行道圍墻不足4 m?;又苓吂芫€眾多,且距離較近。

基坑開挖土層從上到下為:①雜填土,②粘土、粉質(zhì)粘土,③粉質(zhì)粘土,④ 粉質(zhì)粘土夾粉土;厚度(m)分另U為2.4~5.4,1.0~4.2,4.3~9.6,4.1~9.5;層底標(biāo)高(m)分別為一0.77~-2.35,一2.73~-3.9,一8.68~-13.02,一7.49 ~-24.62;穩(wěn)定地下水位位于地面下1.3 m,地下含水量較為豐富。

支護(hù)體系的確定

由于周邊建筑密集,無法采用施工相對方便的預(yù)應(yīng)力土層錨桿,本工程采用柱列式排樁與混凝土桁架混凝土內(nèi)支撐擋土,雙排攪拌樁止水。擋土排樁為樁徑大直徑800mm的鉆孔灌注樁,排樁設(shè)置樁頂環(huán)梁和腰梁各1道。由于基坑較深較長,初步設(shè)計(jì)為2層鋼筋混凝土水平桁架式對撐,后考慮挖土等施工開展將更為困難,修正為基坑中部的第2層對撐取消,僅基坑四角保留2層桁架角撐。

三、土方開挖與換撐措施

1、土方開挖

由于結(jié)構(gòu)設(shè)計(jì)基礎(chǔ)設(shè)有縱橫各2條后澆帶,基礎(chǔ)被后澆帶分成數(shù)塊。后澆帶位置示意見圖1,基坑分3層挖土,并采取分東、西、中3段施工措施。基坑先采用機(jī)械開挖,剩余30cm之后進(jìn)行人工開挖,開挖到指定深度后,立即分塊澆好混凝土墊層和底板,這對防止地基土的擾動(dòng),盡早約束支護(hù)結(jié)構(gòu)的水平位移,減少坑底土的回彈十分有利。

2、換撐措施

拆除支撐前必須有可靠的換撐措施,本工程利用地下室主體結(jié)構(gòu),以方便施工并降低造價(jià),即用地下2層底板與頂板分別作為第l,2次換撐,其C30混凝土澆至圍護(hù)排樁邊,且混凝土澆過相鄰兩樁空隙中心線,混凝土強(qiáng)度達(dá)到C25后,方能分別拆除第2,1道支撐。第2次換撐前,回填土分層夯實(shí),作為換撐體系的重要一環(huán)以有效減少基坑側(cè)壁位移。

后澆帶換撐采用工字鋼作為傳力桿,每根梁處放置1根,梁間的板內(nèi)工字鋼間距約2 m。工字鋼能立即承受荷載,是聯(lián)系基礎(chǔ)各分塊混凝土的可靠保證。四、深基坑降排水方案的選擇與注意措施

為減少對周圍環(huán)境造成不利影響及場地狹小的關(guān)系,施工不能采用坑外降水,而在擋土排樁外設(shè)深層攪拌樁作為截水帷幕。止水樁為 8O0雙排雙軸深層攪拌樁,樁頂標(biāo)高均為一1.80 m,樁間、排間互相搭接200mm,止水?dāng)嚢铇杜c鉆孔灌注樁留空200 mm。為深層攪拌樁與鉆孔灌注樁在施工中因位置靠近,優(yōu)先保證深層攪拌樁的連續(xù)施工,以保證攪拌樁的良好搭接,避免形成水泥初凝后的搭接,這是確保止水帷幕的質(zhì)量關(guān)鍵所在??觾?nèi)擬采用管井降水,后因截水帷幕效果較好,坑內(nèi)管井降水設(shè)施未啟用,采用坑內(nèi)集水井明排水,分層開挖,隨挖隨排。 1、止水降水措施一般有井點(diǎn)降水、帷幕止水防砂、坑內(nèi)降水等。井點(diǎn)降水是普通采用的 經(jīng)濟(jì) 而有效的降水 方法 。但針對本場地的工程地質(zhì)特點(diǎn),在基坑開挖施工前,應(yīng)先進(jìn)行坑內(nèi)降水,因此從施工安全技術(shù)、確保工期和工程質(zhì)量等方面綜合比較 分析 ,宜采用懸掛式深攪樁止水帷幕(帷幕懸在透水層中)與坑內(nèi)井點(diǎn)降水聯(lián)合方案。

由于整理坑降水后,不可避免地造成基坑周圍地下水位的下降,從而使基坑周邊地面原有建筑物和地下構(gòu)筑物因不均勻沉降而受到不同程度的損傷。為了減少以上影響或損傷,應(yīng)在基坑與要保護(hù)的建(構(gòu))筑物之間采取回灌措施,根據(jù)本基坑的地層特點(diǎn),回灌措施采用坑外回灌井,此外為了解地下水位變化,及時(shí)調(diào)整回灌水量,還應(yīng)在基坑周圍設(shè)置水位觀測井。

2、降水過程中應(yīng)注意的問題及應(yīng)對措施

(1)為防止降水引起臨近建筑物及路面、管線出現(xiàn)過大沉降,在降水井點(diǎn)管與建筑物、管線、路面間設(shè)置了回灌井點(diǎn),持續(xù)用清水回灌,補(bǔ)充該處的地下水,使降水井點(diǎn)的影響半徑不超過回灌井點(diǎn)的范圍,使地下水保持基本不變。

(2)冬期施工時(shí),在井點(diǎn)聯(lián)結(jié)總管上覆蓋上保溫材料以防止管道被凍壞。

(3)井點(diǎn)管應(yīng)保持連續(xù)抽水,并設(shè)備用電源,以避免泥渣沉淀總管相連。

(4)夏季施工時(shí),由于連遭暴雨,邊坡產(chǎn)生流砂、坍方、坑內(nèi)嚴(yán)面用重積水現(xiàn)象,工程采用如下應(yīng)急預(yù)案:用塑料薄膜在下雨前將邊坡覆蓋保護(hù)好,并備好足夠的抽水設(shè)備(潛水泵、泥漿泵、水泵、電箱)及人員,及時(shí)將雨水排出坑外;及時(shí)清理排水明溝及沉淀池內(nèi)的淤泥。由于措施得力,基坑未出現(xiàn)開挖坡面大面積坍方現(xiàn)象。

(5)降水過程中個(gè)別井點(diǎn)管不能正常工作,經(jīng)檢查后發(fā)現(xiàn)井點(diǎn)管下部的濾管沒有綁扎好,重新綁扎后該井點(diǎn)管恢復(fù)正常工作。

(6)降水過程中個(gè)別機(jī)組抽水量過小,經(jīng)檢查后發(fā)現(xiàn)是管路的密封性不好,有漏氣現(xiàn)象,重新安裝后該機(jī)組恢復(fù)正常工作。

安全監(jiān)測

為保證基坑與周圍建筑及設(shè)施的安全,基坑施工過程中加強(qiáng)了監(jiān)控工作,在基坑開挖前一星期開始觀測,地下室施工結(jié)束回填土夯實(shí)后繼續(xù)觀測兩星期,以下是部分監(jiān)測結(jié)果。

1、排樁水平位移觀測

排樁水平位移監(jiān)測不僅是監(jiān)控基坑穩(wěn)定的重要工作內(nèi)容,也是保證周邊環(huán)境安全的重要一環(huán)。各測斜孔觀測值變化趨勢基本相同,均為向基坑偏斜,觀測值在近孔處附近最大,以變化值較大的觀測孔CX1,CX4,CX5,CX6的近孔口1m處觀測累加值為例,隨著基坑土體的開挖至設(shè)計(jì)標(biāo)高,測量累計(jì)值增加迅速,挖土停止后一段時(shí)間,位移還在增長,略超過位移報(bào)警值30 mm,隨著基礎(chǔ)地板混凝土的分區(qū)澆筑位移趨于穩(wěn)定,拆除基坑四角第2層支撐后,位移略有增加,達(dá)到整個(gè)監(jiān)測過程的最大位移37.45mm,但尚少于設(shè)計(jì)容許的位移限值50 mm;至7月中旬基坑第2層地下室回填土完成,第2層地下室頂板混凝土強(qiáng)度的增長,位移穩(wěn)定減少,到8月初第l層支撐拆除,位移稍有增加;隨著,位移又趨減??梢姡皶r(shí)做好坑底墊層和分區(qū)澆筑地下室地板,盡可能縮短基坑開挖后的暴露時(shí)間,對減少基坑土壁側(cè)移具有關(guān)鍵意義。

2、基坑外水位變化觀測

若基坑截水帷幕施工質(zhì)量不良,發(fā)生滲漏,基坑外水位下降過多過快,有可能危及周邊建筑及設(shè)施,正值表示水位降低,反之為水位升高,可以看出,本基坑外水位變化與累計(jì)變化都不大,這對減少因基坑施工造成周邊建筑及設(shè)施的沉降很有利,這也反映止水帷幕效果較好,施工中擬定的技術(shù)措施得到了很好的落實(shí)。

3、周邊建筑及設(shè)施沉降觀測

為監(jiān)控基坑施工對周邊建筑與設(shè)施的影響,在排樁頂環(huán)梁、周邊建筑及設(shè)施設(shè)置沉降觀測點(diǎn),由于觀測點(diǎn)與觀測次數(shù)較多,可以看出,在基坑開挖期間沉降增加較快,至地下室底板澆筑完成,沉降趨于穩(wěn)定,各測點(diǎn)在觀測差異沉降不大,和基坑外水位變化不大的觀測結(jié)果可以相互印證。

參考文獻(xiàn):

篇7

隨著我國經(jīng)濟(jì)的快速發(fā)展,各項(xiàng)施工技術(shù)也在迅速發(fā)展中,在國家大力發(fā)展城市化的進(jìn)程中,對于市政工程的工程質(zhì)量以及工程的社會(huì)效益提出了更高的要求,深基坑技術(shù)就是在這一趨勢下應(yīng)運(yùn)而生的產(chǎn)物,有些工程量大、工程設(shè)計(jì)復(fù)雜的工程必須要用到深基坑技術(shù)。因此就目前的發(fā)展趨勢來看,深基坑技術(shù)是市政工程建設(shè)過程中不可少的一項(xiàng)施工技術(shù)措施。因此,本文就市政工程中深基坑施工技術(shù)的施工技術(shù)特點(diǎn)以及在施工過程中應(yīng)該注意的問題進(jìn)行詳細(xì)的分析。

關(guān)鍵詞:

市政工程;深基坑施工;高層建筑;安全管理

就目前的市政工程來說,要想建設(shè)高質(zhì)量的市政工程那首先就應(yīng)該選用高質(zhì)量的建筑材料,如何在深基坑進(jìn)行設(shè)計(jì)過程中如何能更合理、更科學(xué)并且能夠盡量避免出現(xiàn)問題這樣才是最主要的。作為施工方應(yīng)該重視大型建筑物的安全性。在市政工程施工過程中要確保工程按照時(shí)間節(jié)點(diǎn)完成,保證工程的安全進(jìn)度,為為工程的質(zhì)量提供最大的保證在工程施工過程中要注意深基坑技術(shù)的應(yīng)用。在深基坑施工過程中還應(yīng)該要根據(jù)不同建筑物的施工條件、基坑條件等客觀因素綜合考慮,制定全面、合理、科學(xué)的施工組織方案,用來全面保證施工的安全以及確保市政工程的施工質(zhì)量。下面就是對市政工程深基坑施工過程中應(yīng)該注意的問題以及解決措施進(jìn)行詳細(xì)的分析。

1深基坑工程

所謂的深基坑技術(shù)是對施工技術(shù)要求很高的一項(xiàng)工程,在深基坑施工前要根據(jù)首先確定深基坑施工方案,要嚴(yán)格按照設(shè)計(jì)要求選擇高質(zhì)量的基坑支護(hù)材料,在對深基坑進(jìn)行開挖時(shí)要根據(jù)地質(zhì)勘測的要求,對基坑進(jìn)行合理的放坡,并且對放坡進(jìn)行保護(hù)避免土體收到擠壓力或者其他外力的作用而出現(xiàn)坍塌。由于深基坑有很強(qiáng)的技術(shù)性要求,因此,國家對于深基坑的技術(shù)要求也進(jìn)行了相應(yīng)的規(guī)定,根據(jù)我過建設(shè)部的文件規(guī)定深基坑一般分為2種:第一種就是開挖深度超過5m(包括5m)的基坑的土方開挖、支護(hù)和土方開挖工程;第二個(gè)就是開挖深度沒有超過5m,地址條件、周圍環(huán)境和地下管線復(fù)雜,且影響周圍建筑物安全的基坑降水、支護(hù)和土方開挖工程這就要求必須采取嚴(yán)格的控制措施控制深基坑施工技術(shù),從而減少或者避免發(fā)生一些不必要的施工問題。

2深基坑急速的主要施工內(nèi)容

深基坑技術(shù)一直被認(rèn)為是對施工要求技術(shù)高、施工難度大、工程量巨大、施工工序多、施工影響因素多的工程。在深基坑施工過程中,施工技術(shù)的高低決定了深基坑工程的工程質(zhì)量。施工方案設(shè)置是否合理、施工工人對于技術(shù)掌握的熟練程度、現(xiàn)場施工機(jī)械的使用情況、施工現(xiàn)場的管理對于深基坑施工來說都是非常重要的。在深基坑工程施工前要采取制定的技術(shù)措施要對周圍建筑進(jìn)行維護(hù),用來保證周圍建筑物的安全性,在基坑施工前要進(jìn)行嚴(yán)謹(jǐn)?shù)默F(xiàn)場地質(zhì)勘查,在工程施工前要對地下施工條件詳細(xì)的掌握,避免在施工過程中由于對地下機(jī)構(gòu)不了解而對地下結(jié)構(gòu)造成破壞。施工前要做好施工準(zhǔn)備。在施工過程中要對現(xiàn)場施工人員進(jìn)行技術(shù)交底,避免由于現(xiàn)場施工人員出現(xiàn)工作懈怠、工作不認(rèn)真等負(fù)面的施工思想;施工前要在地質(zhì)勘查以及設(shè)計(jì)單位拿到具體的現(xiàn)場施工數(shù)據(jù)。要對現(xiàn)場進(jìn)行仔細(xì)的勘查并且進(jìn)行詳細(xì)而精準(zhǔn)的測量,確定地下打樁的具置,認(rèn)真勘查地下是否有市政管線,如果測算出深基坑可能會(huì)對周圍建筑或者地下管線,要首先對這些建筑物進(jìn)行維護(hù)、隔離、加固等保護(hù)措施,減輕深基坑施工過程中對這些建筑物的破壞,避免出現(xiàn)不應(yīng)該出現(xiàn)的情況造成不必要的損失。

在深基坑支護(hù)形式來看,一般采取的支護(hù)形式有樁錨支護(hù)、土釘墻支護(hù)、懸臂樁支護(hù)、復(fù)合土釘墻支護(hù)和加固支護(hù)。深基坑無論是采用哪一種支護(hù)形式,都要根據(jù)現(xiàn)場的施工條件、結(jié)構(gòu)類型、周圍環(huán)境進(jìn)行深度分析,要根據(jù)不同的基坑支護(hù)所使用的建筑結(jié)構(gòu)特點(diǎn)選用不同的支護(hù)形式。深基坑施工過程中很容易出現(xiàn)大面積土體坍塌的情況,所以在施工過程中一定要注意時(shí)刻觀察周圍土體的變化,要對施工現(xiàn)場進(jìn)行嚴(yán)格的管理,并且要嚴(yán)格設(shè)置施工工期,嚴(yán)格按照施工節(jié)點(diǎn)進(jìn)行施工。選用適合的施工支護(hù)結(jié)構(gòu),不僅能夠降低施工成本,而且還不會(huì)對施工周圍的環(huán)境結(jié)構(gòu)造成破壞,在此基礎(chǔ)上還鞏固了深基坑的施工條件。

3深基坑施工常見問題的解決措施

對于市政工程而言,深基坑技術(shù)是一項(xiàng)投資大、技術(shù)復(fù)雜,工程量大、工程施工周期長、耗費(fèi)大量人力的工程。并且,在施工過程中會(huì)出現(xiàn)一些不可避免的意外情況,因此要想保證市政工程的順利施工進(jìn)行,提高工程的經(jīng)濟(jì)效益和社會(huì)效益不僅僅要追求技術(shù)創(chuàng)新,更重要的是要注意施工過程中的施工細(xì)節(jié)問題,避免出現(xiàn)由于一些小的施工細(xì)節(jié),以防影響整個(gè)市政工程的施工進(jìn)度繼而影響了市政工程的順利竣工和按時(shí)投入使用。在深基坑工程施工過程中為了避免出現(xiàn)現(xiàn)場施工質(zhì)量問題,首先應(yīng)該是嚴(yán)把現(xiàn)場材料關(guān),在施工現(xiàn)場要嚴(yán)格禁止質(zhì)量不合格的材料進(jìn)入施工現(xiàn)場,因?yàn)樵O(shè)計(jì)出施工對于施工材料的依賴性很強(qiáng),所以在這種情況下就應(yīng)該安排專業(yè)人員對施工現(xiàn)場的材料進(jìn)行檢查,對進(jìn)入施工現(xiàn)場的施工材料進(jìn)行專業(yè)實(shí)驗(yàn),并且對材料的出廠合格證以及和質(zhì)量有關(guān)的材料整理齊全,只有檢驗(yàn)合格后才能在施工現(xiàn)場予以使用。針對施工現(xiàn)場的施工安全問題,現(xiàn)場施工應(yīng)該安排專業(yè)的安全監(jiān)督員,對施工現(xiàn)場的進(jìn)行定期的安全質(zhì)量檢查,對有可能有安全威脅的因素提前提出來并提出合理的施工解決方案。第三個(gè)方面應(yīng)該是加強(qiáng)現(xiàn)場施工人員的再教育培訓(xùn),對現(xiàn)場施工人員進(jìn)行崗前培訓(xùn),在讓施工人員在熟悉掌握新的技術(shù)的同事,還應(yīng)該給現(xiàn)場施工人員灌輸安全施工意識,樹立現(xiàn)場施工人員的安全責(zé)任意識。這樣才能在技術(shù)、材料、人員等方面全方位保證工程的順利進(jìn)行,這樣才能在對工程的質(zhì)量提供強(qiáng)有力的保證。

4結(jié)束語

綜上所述,深基坑施工是建筑工程中涉及面廣、內(nèi)容非常豐富的項(xiàng)目,同時(shí),也是大型建筑工程施工中難度最大、技術(shù)應(yīng)用最廣的工程之一。隨著各種建筑越來越多的出現(xiàn)在人們的視野中,市政工程中的深基坑施工與整個(gè)建筑工程的質(zhì)量、人們的生命財(cái)產(chǎn)安全的關(guān)系也越來越密切。施工單位在進(jìn)行深基坑施工的同時(shí),一定要有效解決常見問題、制定詳細(xì)的施工方案、嚴(yán)格監(jiān)督管理施工人員的操作,從而保證建筑工程的質(zhì)量。這樣不僅會(huì)給市政工程畫上美麗的一筆,還會(huì)提高施工單位在房建企業(yè)中的知名度和競爭力。

參考文獻(xiàn)

[1]賴欽濤.關(guān)于市政工程施工中的深基坑施工技術(shù)探討[J].科技與創(chuàng)新,2015,02∶143.

[2]蘇中華.市政工程施工中的深基坑施工技術(shù)分析[J].山東工業(yè)技術(shù),2014,24∶100.

[3]鄭義.市政工程基坑施工技術(shù)探討[J].科技創(chuàng)新與應(yīng)用,2015,04∶149.

[4]程瀛,邵泉,蔡科.復(fù)雜市政環(huán)境下深基坑工程施工關(guān)鍵技術(shù)[J].施工技術(shù),2015,18∶105-109.

篇8

【關(guān)鍵詞】深基坑施工;基坑監(jiān)測;監(jiān)測技術(shù)應(yīng)用

隨著建筑行業(yè)的發(fā)展,深基坑的安全性逐漸成為建筑施工關(guān)注的重要問題之一。但是,近幾年來,我國的土地資源的利用效率越來越高,就要求深基坑的深度擴(kuò)大,這就給深基坑的安全問題帶來了威脅。特別是對深基坑施工,需要提高檢測技術(shù)的實(shí)際運(yùn)用。所以,在實(shí)際的工程建筑施工中,就要增加對深基坑監(jiān)測技術(shù)的重視度,采用對位移與沉降等幾個(gè)方面的測量,達(dá)到提高深基坑施工過程中的安全性與工程的質(zhì)量。

1. 深基坑施工監(jiān)測技術(shù)應(yīng)用的意義

在深基坑建設(shè)施工的監(jiān)測中,采用的原理是在建設(shè)施工時(shí)間內(nèi)利用對建設(shè)施工現(xiàn)場或者周圍環(huán)境進(jìn)行一些列數(shù)據(jù)測量檢查等,采用規(guī)范的數(shù)據(jù)檢測技術(shù)在工程的實(shí)際應(yīng)用,將檢測結(jié)果及數(shù)據(jù)分析結(jié)果及時(shí)反饋到工程施工管理中,對相關(guān)注意事項(xiàng)進(jìn)行指導(dǎo)。提高工程的可行性,同時(shí),保證工程的安全性能。但由于建設(shè)施工現(xiàn)場的土壤的土質(zhì)、負(fù)荷等因素的影響,就會(huì)造成工程施工障礙,因此,對工程的檢測就是為了防止出現(xiàn)類似的情況。

深基坑的檢測技術(shù)的作用主要表現(xiàn)在:一是在工程施工之前,深基坑監(jiān)測技術(shù)在工程施工中的應(yīng)用達(dá)到的指導(dǎo)作用;二是在工程施工過程中,由于檢測技術(shù)的實(shí)時(shí)監(jiān)控,對檢測的數(shù)據(jù)進(jìn)行分析得到控制工程安全質(zhì)量的結(jié)果;三是根據(jù)深基坑的監(jiān)測技術(shù),保證施工人員在管道、線路等的施工過程中準(zhǔn)確掌握地下的分布情況;四是在深基坑施工前后,對工程進(jìn)行檢測有利于保證工程的規(guī)范性,避免一些危險(xiǎn)事故的發(fā)生,從而減少損失。

2. 深基坑施工中基坑監(jiān)測技術(shù)的監(jiān)測原則

深基坑施工中,會(huì)出現(xiàn)一些不可避免的問題,采用深基坑的檢測技術(shù)時(shí)要結(jié)合實(shí)際情況,采用合理的監(jiān)測實(shí)施方案,幫助工程施工的正常進(jìn)行。因此,要加強(qiáng)施工中深基坑對監(jiān)測技術(shù)的充分利用,就要遵循一定的原則。由于工程的復(fù)雜性,決定了施工現(xiàn)場都會(huì)存在多多少少的問題,采用深基坑監(jiān)測技術(shù),不僅能夠增加工程的組織的安全性能,還能夠發(fā)現(xiàn)施工現(xiàn)場的事故的發(fā)生率,防止出現(xiàn)不必要的損失。

在具體施工過程中,為了保證工程的安全性能,就要采取合理的工程檢測技術(shù)。采取補(bǔ)救措施不僅能夠保證工程的質(zhì)量安全性能,還能在一定程度上節(jié)約工程的成本,在保證降低工程事故發(fā)生率的基礎(chǔ)上,利用檢測技術(shù)的統(tǒng)計(jì)結(jié)果,增加檢測的可利用性。所以,在實(shí)際檢測技術(shù)運(yùn)用中要遵循的原則:一是要遵循多次檢測原則,由于土質(zhì)的特殊性與不可控性,對于檢測技術(shù)的檢測結(jié)果也存在不可靠性。因此,基坑的變形量因素需要經(jīng)過多次檢測才能得到有利于工程建設(shè)參考的數(shù)據(jù)。二是要遵循重點(diǎn)檢測原則,在工程的施工中,由于工程的特殊性,存在需要重點(diǎn)檢測的工程信息。例如,深基坑的施工中,由于工程的圍護(hù)結(jié)構(gòu)與土體之間存在作用力,導(dǎo)致工程在這方面出現(xiàn)的問題較多。因此,需要對這部分進(jìn)行重點(diǎn)監(jiān)測,得到可靠數(shù)據(jù)作為工程施工政策的改善標(biāo)準(zhǔn)。三是要遵循實(shí)用性原則,對工程的檢測一定要結(jié)合具體實(shí)際,確保工程的可實(shí)用性。

3.深基坑監(jiān)測技術(shù)的主要內(nèi)容

深基坑的工程施工中,一定要對地下水位、對基坑的橫向縱向位移及其深層水平位移等進(jìn)行監(jiān)測,在對基坑的土體壓力、裂縫數(shù)量、孔隙等的檢測時(shí),尤其要注意對基坑的水平與豎直的位移。其中要做到:一是要注意對基坑的傾斜角度,或者任意方向的基坑的監(jiān)測,采用基坑位移在水平或者豎直方向的監(jiān)測技術(shù),利用坐標(biāo)或者方向的交匯的方法進(jìn)行基坑位移的監(jiān)測;二是在基坑某個(gè)方向的位移測量中采用投點(diǎn)法或者小角度法對基坑的相關(guān)位移進(jìn)行監(jiān)測;三是若是基坑之間的距離很遠(yuǎn)時(shí)就采用GPS 定位進(jìn)行測量。

在對深基坑的地下水位監(jiān)測中,要保證地下水位在合理控制范圍內(nèi)避免深基坑遭到地下水位的影響。在對地下水位監(jiān)測中,利用水位計(jì)等詳細(xì)記錄統(tǒng)計(jì)水位數(shù)據(jù),分析地下水位對工程施工的影響程度,保證工程施工的正常進(jìn)行。在遇到水位影響工程施工的情況時(shí),要適時(shí)對基坑的水位作出合理調(diào)整,進(jìn)行多次試驗(yàn),保證工程數(shù)據(jù)的可行性。

4.對于在施工深基坑的時(shí)候監(jiān)測技術(shù)的注意問題

對于基坑監(jiān)測技術(shù)來說,它是一個(gè)雙方互幫互助的工程,在做施工之前我們應(yīng)該確定需要檢查的工程,進(jìn)而做出合理的檢查對策,對于監(jiān)測的一些方法以及結(jié)果,需要對它們進(jìn)行細(xì)致的策劃。另外,還要對施工以及旁邊建筑的環(huán)境進(jìn)行進(jìn)一步的了解,最后還要與各個(gè)部門做好協(xié)商和交流,相關(guān)政府部門也要對深基坑施工的做進(jìn)一步的監(jiān)督,以及讓施工的順利完成。具體深基坑的施工需要根據(jù)具體的現(xiàn)場土壤進(jìn)行規(guī)整,以便達(dá)到環(huán)境的要求。深基坑工程的監(jiān)測具有時(shí)效性,結(jié)果也是不斷變化的,需要根據(jù)深基坑監(jiān)測工作做進(jìn)一步的管理,在施工的過程中,需要對周圍加強(qiáng)監(jiān)測,還要及時(shí)的收集檢測結(jié)果,充分把握準(zhǔn)確性。深基坑的監(jiān)測技術(shù)需要借助一定的儀器監(jiān)測,同時(shí)也要確保在一個(gè)合格的環(huán)境下,才能夠達(dá)到所需的準(zhǔn)確精度。為了能夠確保監(jiān)測結(jié)果的精度,我們需要在監(jiān)測過程中按照單一變量的原則進(jìn)行,如果監(jiān)測人員發(fā)現(xiàn)了施工問題,需要及時(shí)報(bào)告,使基坑監(jiān)測技術(shù)發(fā)揮充分的作用。

5.小結(jié)

深基坑監(jiān)測技術(shù)對于基坑的穩(wěn)定性以及基坑圍護(hù)結(jié)構(gòu)的安全能夠起到很大的積極作用,對周圍環(huán)境和已有建筑物的影響達(dá)到最小化。在深基坑的監(jiān)測過程中,施工單位可以依據(jù)它們提供的的數(shù)據(jù)對施工進(jìn)行規(guī)劃與計(jì)劃,降低安全問題。還有就是監(jiān)測技術(shù)提供的的數(shù)據(jù)還可以對施工方案提供一定的依據(jù)。本文就是在結(jié)合具體情況的基礎(chǔ)上,對深基坑的基坑測量技術(shù)的實(shí)際應(yīng)用的研究,提出相應(yīng)的應(yīng)用方法,希望能夠幫助有關(guān)建筑施工提高施工的經(jīng)濟(jì)效益。